Migros Market Locarno
Description
System design for strand detensioning within slabs built in the 1990s. The project involved partial demolition of the slab in the detensioning area, cutting and gradually detensioning the strands, demolition of the slab, and retensioning of the strands.
Construction Site Duration: 2025
Amount of works:
Company: Sorotec SA
Work Direction: Sorotec SA